This project at YULA Girls High School, an Orthodox student-centered, college preparatory high school in Los Angeles, included the renovation of the school’s gymnasium and Beit Midrash (study hall). The renovation of the gymnasium included a new framed glass partition and a clear glass double door. The basketball court now includes new basketball hoops, new graphics, and new protective pad wall panels. The project also included the installation of new light fixtures and new steel beams. The floor upgrades included refinishing existing wood floors, installing rubber floor in the fitness room, and installing rubber base.